Ti trovi: HOME > Projects > Completed projects > The MO.S.E. system - Lido

The MO.S.E. system - Lido

Torna a 2 Torna a 2 Torna a 2

As the Lido inlet is wider than the Malamocco and Chioggia inlets, two barriers are being constructed, Lido Treporti, 420 metres long, and Lido San Nicolò, 400 metres long, connected by an artificial island accommodating the plant and installations required to operate both barriers. Coge Mantovani was responsible for constructing all the infrastructure on the Lido Treporti side: protection of the seabed in the inlet, small craft harbours, lock, prefabrication and positioning of the housing structures measuring about 60 x 40 x 11 metres and acting as the barrier foundation, the electromechanical plant and installation of the 21 gates measuring 18.5 x 20 x 3.6 metres. It also constructed the artificial island linking the two barriers and part of the breakewater in front of the inlet.

Client Ministry of Infrastructure and Transport / Venice Water Authority, through its concessionary, the Consorzio Venezia Nuova
Operational Sector Maritime infrastructure
Coastal protection
Undersea tunnels
Special works
Maritime and river works
Value € 740,300,000.00
Value of Coge Mantovani € 555,400,000.00