Ti trovi: HOME > Projects > Completed projects > The MO.S.E. system - MALAMOCCO

The MO.S.E. system - MALAMOCCO

Torna a 2 Torna a 2

In the context of the Mose system, the particular characteristic of the Malamocco inlet is the presence of a lock to allow the transit of large ships. Coge Mantovani was responsible for the construction of the lock with net dimensions of about 370 x 50 metres and a depth of about 14 metres. Coge Mantovani also carried out all the constituent civil and maritime construction work: reinforcement of the barrier recess, construction of the areas and buildings accommodating the barrier operating equipment, protection of the seabed in the inlet and part of the breakewater in front of the lock and the inlet.

Client Ministry of Infrastructure and Transport / Venice Water Authority, through its concessionary, the Consorzio Venezia Nuova
Operational Sector Maritime infrastructure
Coastal protection
Undersea tunnels
Special works
Maritime and river works
Value € 663,300,000.00
Value of Coge Mantovani € 454.500.000,00